Monday 31 January 2011

space!

This weekend, I demolished the shower and removed the toilet as well as it's plumbing. you can see an unpainted square on the grey floor where the toilet was!
Dad came and gave me a hand, scraping away a lot of the old paint that had been hidden.

Monday 24 January 2011

demolition

Now I've painted the inside of the hull on the starboard side, it's time to sport out the port side, which means the demolition of the old heads and galley, to gain acess to the hull behind. It seems a little extreme, but unfortunately nobody has cleaned or painted these bits of the boat for since the last century.

Here is the toilet, with the with the surrounding woodwork removed, on the right the hull is freshly painted, and to the left is the next part to be sorted out.

Saturday 15 January 2011

This week we've been painting during the evenings, The woodwork we cleaned up over the last few weeks is now primed and undercoated, which makes the inside of Mudlark look a lot cleaner :)

Sunday 9 January 2011

scraping and painting

We've just painted the next section of the inside of the boat with primer.
Over the last few weeks we've all had a go at cleaning it up, and I spent most of yesterday fixing the bits of woodwork that needed attention.

Here's Juan painting the fiddly bits, whilst I spread paint everywhere else with a roller! All the woodwork to his right is now painted white :)