We had fun battling with the wind, in the end fixed the edges whilst standing in the dinghy!
After a much needed lunch break, the sun came out so we managed to do some painting. Juan painted the metalwork round the edge of the aft locker, whilst I cleaned up and then primed the newer metal work inside the aft cabin.
No comments:
Post a Comment